Raleigh Hosting

SAS 70 Cloud Data Center - Raleigh, NC

Building
Total Size 31,000 square foot data center facility
Construction Concrete brick structure with reinforced steel
Floor Space
Total Raised Floor 17,000 sq. ft. of secure colocation space
Communications
Carriers Level 3, Time Warner, Savvis, Verizon
Internal Cabling Diverse routes - copper or fiber access. 10 Mbps, 100 Mbps or 1 Gbps Ethernet available.
External Cabling Redundant self-healing SONET ring connections
Power
UPS Six (6) 500 kVA UPS systems
Generated Power 2000 kW diesel generator
Power Cabling All power cabling below data center floors is installed in either conduit or seal-tight flexible conduit with approved connectors to all equipment
All Systems Supported by 24/7/365 staff, computer monitoring and secure data center facility engineers
PDU Eight (8) dual source PDUs
Cooling
Air Handling Supported by 24/7/365 computer monitoring and data center facility engineers
Cooling Redundant EVAPCO Cooling Towers
HVAC Nineteen (19) 30-ton HVAC Units
Air Quality Humidity and temperature controlled - air temperature under floor delivered at 68° ± 5° with humidity at 50% ± 5%
Water Detection Leak detection under all raised data center floors. Drains are utilized to remove any water from under Raleigh colocation data center floor.
Fire Protection
Smoke & Heat Detection Smoke sensors above raised data center floorstd>
VESDA Very Early Smoke Detection Apparatus, the world's leading air sampling smoke detection system, provides the earliest possible warning of a potential fire event by detecting smoke particles at the incipient (first) stage of fire
Multi-Stage Protection Pre-action dry pipe system requires alert from two sensors, which activates pipe fill and releases water at a final stage when the temperature exceeds thresholds
Physical Security
Entrances All Raleigh colocation data center entrances require card key access or biometric authentication, along with security sign in. The Raleigh data center floor and secured areas require card key and biometric authentication (finger print or iris scan).
Security Guards Guards on site 24x7x365 conducting active patrols both inside and outside the facility
Closed Circuit Video CCTV cameras cover the inside and exterior of the building, the property perimeter, all entrances, alternate workspace, and the Raleigh data center floor. The roof of the building is monitored with CCTV and motion detectors.
Facility Monitoring
Facility Engineers Facility engineers are on site at the Raleigh colocation data center and are available by pager. The engineers are trained to control and maintain all critical facility components.
Power Management Critical power systems are controlled by an automated management system, which controls all switching.
Environmental Management Air temperature, humidity, fire detection, and water pressure systems are all managed by automated control systems for the Raleigh data center
Syndicate content